
The generative AI revolution has created a power density crisis, rendering traditional 18 to 24 month data center construction timelines obsolete.
Organizations now face a strategic mandate to deploy massive, high-density AI compute in six months or risk being outmaneuvered. This guide presents an actionable blueprint for achieving this by deploying liquid- cooled, prefabricated modular AI pods.
The core challenge is that modern AI accelerators have pushed rack power densities beyond 100 kW and will soon be beyond 600 kW, a full order of magnitude greater than what legacy air-cooled facilities can support.
The only viable path forward is the convergence of two key technologies
This guide deconstructs the market drivers, provides a technical primer on essential cooling solutions, details the integrated pod architecture, and presents a phased ~180-day deployment plan with risk mitigation strategies. It is a field manual for leaders tasked with building the next generation of AI-ready infrastructure.
Download the full whitepaper here